Sentera uses cookies !

Learn more
Logo Sentera

Sentera – your partner in HVAC control solutions

End of life approaching

These articles are end of life approaching. The new variant is mentioned in the product details. We advise to switch to the more recent products.

51 item(s) in 5 page(s)
Potentiometer for EC fan with 0-10 VDC  0-20 mA  PWM output and dry contact output MTV-1-010-CP
Article code MTV-1-010-CP
Available
Current stock 31 U.
Factory lead time: 4 Week(s)
Next arrival: 28/08/2020 - 120 U.
Room temperature sensor, switch - ACDC supply RXT-G
Article code RXT-G
Available
Current stock 1 U.
Factory lead time: 4 Week(s)
Next arrival: 28/08/2020 - 72 U.
Potentiometer for EC fan with 0-10 VDC  0-20 mA  PWM output signal MTV-1-010-PM
Article code MTV-1-010-PM
Available
Current stock 19 U.
Factory lead time: 4 Week(s)
Room CO2 sensor and switch - ACDC supply RXC-G
Article code RXC-G
Available
Current stock 29 U.
Factory lead time: 4 Week(s)
Duct CO2 sensor, switch - ACDC supply DXC-G
Article code DXC-G
Available
Current stock 0 U.
Factory lead time: 4 Week(s)
Room relative humidity sensor, switch - ACDC supply RXH-G
Article code RXH-G
Available
Current stock 4 U.
Factory lead time: 4 Week(s)
Duct relative humidity sensor, switch - ACDC supply DXH-G
Article code DXH-G
Available
Current stock 8 U.
Factory lead time: 4 Week(s)
Duct temperature sensor, switch - ACDC supply DXT-G
Article code DXT-G
Available
Current stock 14 U.
Factory lead time: 4 Week(s)
Multifunctional room sensor, switch T, rH - ACDC supply RXTHG
Article code RXTHG
Available
Current stock 2 U.
Factory lead time: 4 Week(s)
Dual differential pressure transmitter 2000 Pa - ACDC supply SPD-G-2K0
Article code SPD-G-2K0
Available
Current stock 7 U.
Factory lead time: 4 Week(s)
Dual differential pressure transmitter 6000 Pa - ACDC supply SPD-G-6K0
Article code SPD-G-6K0
Available
Current stock 30 U.
Factory lead time: 4 Week(s)
Differential pressure сontroller 0-2000 Pa - ACDC supply SPSPG-2K0
Article code SPSPG-2K0
Available
Current stock 37 U.
Factory lead time: 4 Week(s)
VK Icon
LinkedIn Icon
Follow us on
© 2020 Sentera. Powered by Bea Solutions